This large scale domestic underfloor heating project was installed by Logistical Building Services into a development of eight £2m luxury homes for housing developer Berkeley Homes.

The installation totalled over 50,000sq ft of underfloor heating to the ground floor of the properties, with radiator systems installed into the upper floors using Maincor MLC pipe-in-insulation and connected with Maincor Press Fittings.  The heating systems are controlled using Maincor wired air temperature heating controls to provide maximum comfort for the occupants with zoned heating control.

Throughout the course of the project, Maincor provided the system design, completed a site survey with the client and provided installation training and after care support to ensure that the project ran as smoothly as possible.

Client Testimonial
Logistical Building Services (Electrical) was pleased to have had the opportunity to work with Berkeley Homes on the Wimbledon Hill Park project and install Maincor underfloor central heating to these eight prestigious properties with the guidance of Maincor. On this project we installed some 50,000 square feet of underfloor central heating to these properties with further phase to follow.”

Download Maincor Case study - wimbledon park PDF

Back to News